
In getting the top-floor unit ready for our paying guests, we found ourselves with a longer to-do list than we originally anticipated. Isn't that always the case? While the electrical and plumbing systems take priority, it was fixing the ironing board and cleaning up the ice box that were the most satisfying tasks.
The built-in ironing boards were definitely one of those vintage details that sold us on The Box House in the first place. Each unit has one. But the one on the top floor was off its hinges and the screw holes were stripped. There was no way they'd hold new screws. There were also some dowel rods on the underside that needed replacing.
To take care of the screw holes, I filled them with PL Fix Wood Repair to create a new surface. We were very impressed with how it worked. Ted was able to screw the hinges back into the ironing board and said it was "almost" like screwing into wood. So we do recommend this product.



As for the ice box "repair", that was a bit of a surprise. When I was at Home Depot for my 20th trip of the week, Ted secretly stripped off the old and ugly contact paper that was covering the tenants' ice box in the pantry:

