16 January, 2009

Home Improvement Resolutions for January 2009

We decided not to make a list of New Year's Home Improvement Resolutions for 2009. Our list of uncompleted projects at the end of 2008 was just too depressing. Instead, we're going to do a month-by-month list of goals that we might reasonably be able to accomplish in a 30-day period. This is what we want to accomplish for January, and where we're at now that it's the middle of the month:

1. Remove drywall and shelves in our "electrical room" and clean room [Done]

This room was a disaster. I forgot to get a picture of what it looked like before I started. Every inch of space was cluttered with stuff [read: junk] left behind by the previous owners, including 30 odd cans of old paint now waiting in the garage to be hauled down to the recycling center. [Note to self: On next home purchase, make sure we have it in writing that the seller will have all of their possessions removed; don't just believe it when they say they will.] Above is a picture of some of the bounty I dragged out into the laundry room. This is maybe a fifth of what was in there.

Here's the closest thing I have for a before picture; the window in back had been replaced last month, and then replaced again a few weeks later after this picture was taken when it developed a stress crack [thank you, Scientific Window, for your 20-year guarantee]. The electrical room is so named because that's where our service boxes are for both units, which are off to the right in the photo. These were "upgraded" in 1970, based on a receipt we found in the basement. Ted had already removed the ceiling board in this room, and I was about to remove the shelves and wallboard, behind which were literally hundreds of spider egg sacs and a quarter-inch of coal dust.

After (at right): I think it took about six or seven hours total to remove and break down the wall board, clean every surface of coal dust, scrub down the floor, haul the junk out to the garage, haul our old metal shelves in, and stock the room with supplies--both ours and the previous owners--we think we might actually need. I know, I know, it still looks like a grotty basement room to the untrained eye, but to me it's a haven of order and [semi] cleanliness. Behind the wallboard (dated 1926) was the wood-slatted wall shared with the storage room. You can follow that link to see what the boards look like.

Also in the electrical room, we found the fireplace insert for the second-floor unit. Okay, we knew it was there, but it was pretty filthy and covered in spider egg sacks. This was the first real opportunity I had to drag it out and get a good look at it. Here it is with most of the dirt knocked off of it.

It needs to be rewired and derusted, but it's pretty cool. On the underside of the logs are two lightbulbs, one red and one whitish-yellow, to simulate that warm fireplace glow. At present, the tenants upstairs are using a modern light-only fireplace insert. I have no idea if this restoration project will make it to my list of things to get done this year or not.

2. Get the rest of our possessions out of Mom's other house so the new tenants can settle in. [Done]

We did manage to do this, but an unexpected flood in the basement kept us over there more often than we planned.

Okay, so those are the only things we've accomplished on the list so far. Here are the rest of the goals for January 2009.

3. Install new light on back porch

This is for the landing leading to the upstairs porch. At present, it's a bare bulb.


4. Finally finish cleaning and reassembling the 1920s toilet in the basement that we took apart a year ago and bought replacement parts for in June.

Seriously, I'm sick of tripping over the pieces, and we really need another working toilet.

5. Finish removing grotty old ceiling board in both the mechanical rooms, and demo the wall inbetween them.

Two boilers, two water heaters, two rooms to house them. We refer to these rooms as the Mechanical Room and the Tool Room, the latter so named because that's where all our tool chests and assorted fix-it gear have ended up. And the wall separating these rooms? You can hardly call it that, it doesn't even reach the ground, but sort of hovers over the floor drain.

6. Install new door to Ted's office, which currently does not have one.

We found a door at Menards to match the five-panel doors we have downstairs already. It's sitting on its side, still in its packaging crate. We just need to find age-appropriate hardware. This does not mean that the door will be stained and finished, but it will be at least be hanging in place until we can get it finished.

7. This is on Mom's list, to select a replacement sink and toilet for the first floor unit's bathroom.

After a year of using a bucket of water to make sure everything flushes down properly, it's time. It's strange how normal that act has actually become. The ridiculousness of it only crosses my mind when I have to explain the procedure to guests.

Alrighty, that's it. The pressure is on! Only two weeks to the end of the month. Any bets if we'll get it all done?

13 January, 2009

Maggie's New Toy -- A Dreidel!

Petsmart had holiday toys on the clearance rack, and we picked up this stuffed dreidel.

Instead of squeaking, it plays the dreidel song!

The video is dark, but you can hear the tune. (And yes, that's my voice.) It lasted maybe five minutes before she ripped out the stuffing; one of her favorite games is to find and pull out the squeaker of any stuffed toy, so she doesn't get these often.

12 January, 2009

Interior Drain Tile System for the Basement

Water, water, everywhere--

Well, we had several contractors come out to look at my mom's basement to see what might be going on. According to our tenants, water has been coming in at a steady rate since last week. They've been nice enough to keep sweeping it towards the sump pump pit, but I know it's a huge hassle for them and not something they wanted to tackle right after moving in. To complicate things, one of the two sump pumps--located at either end of the basement--just burned out.

The general consensus is that with the record rains we've had the last few years, the water table in the area has risen. There has been an increase in the number of basements taking on water The neighbors on either side of mom's house are currently dry, but her house does sit a little lower.

The seepage is coming from the cove joints, where wall and floor meet, as well as from a few cracks in the floor slab, common symptoms of hydrostatic pressure. Basically, the water table is trying to equalize itself from the exterior walls to the inside of the basement. We need an interior footing drain tile system. This will relieve the pressure, and channel the water to a sump pit.

What that means is that they will have to crack the concrete all around the interior perimeter and install a perforated drain in a bed of washed gravel, leading to the sump pump. This will get covered back up with concrete. I found a few pictures online of what this looks like:

Estimates range from $4400-$10,000. Yeah. Ouch. One guy was immediately eliminated from our short list because he was awfully patronizing, actually holding his finger up in mom's face and hushing her so he could go on with his long-winded explanation. You simply don't hush Mom if she has a question and expect to get her business.

I think we're going with a contractor in the $5500 range; we need to verify a few things yet, but it looks like his price includes building a whole new sump pit. Ours looks in rather sad shape; it's metal and 30+ years old. They'll patch a few minor cracks on the walls as well. The estimator is going to check with his boss, but may be able to include putting a concrete slab in our crawlspace as well for the same price. We'll see. (The crawlspace is currently gravel, and never gets used. Having it available for additional storage might be nice.) Their lifetime guarantee actually is for the lifetime of the house (others guaranteed the work for 10 years) and is transferable to subsequent owners. Best of all, they can schedule it this week and get it done in a day because they have a large crew. Other estimates said it would take 2-3 days and we'd have to wait 2-3 weeks.

So, while a nasty unexpected expense, we're looking at a guaranteed dry basement as a good selling point in the future, adding value to the house.

So, now we have to tell our tenants, who just set up a jumbo aquarium in the unfinished basement, that they'll have to move it so work can get done.

Update: The contractor who was already our number one pick ended up giving us a new bid of $5000, which does include laying a slab in the crawlspace. Times are tough out there, I guess, and he knew we had other contractors making bids. It's definitely a good idea to comparison shop; even the well-rated guys (per Angie's List) are willing to make deals now. They're coming in Monday at 7:30 and should be done by 5:00. Can't beat that.

05 January, 2009

Well, $#&*#$. We don't need problems with the foundation.

Today was supposed to be a happy day.

Mom's tenants moved into her other house this weekend, and Ted and I were over there this evening to pick up the last of our possessions: a desk, a dollhouse, and an old file cabinet. After more than a year of moving stuff (we had rented out our condo, moved to Mom's, put some of our stuff in storage, closed on The Box House, moved our stuff from storage to Evanston, and moved Mom's stuff here) we were done. Now we had tenants for both the extra properties, and could wait out the housing crisis and bad economy until we could sell them.

We were actually in high spirits as we drove to the Western suburbs, knowing that we wouldn't have to make the trek out there as frequently. I was even okay this time having to ring the doorbell to be let in.

And then I made the mistake of asking how things were going, and if they were all settled in.

They were settling in nicely, they assured us, but wanted to let us know that there was water in the basement.

What???

The only time there was ever water in the basement was when the sump pump failed, and we didn't have a battery back up. The sump was working now--our handy man we sometimes use when we can't get out to the house had even checked it a few days before--but there was a small amount of water pooled in the middle of the basement and along all the edges. We could actually see it seeping in on the western edge, where wall met floor. My mouth literally dropped open, I was so surprised.

Seriously, what the heck?

The best we can figure, since the sump was working, is that the rapid freeze and thaw of last week, in which the temperature went up forty degrees and then back down within 12 hours, had somehow shifted or nudged or did some damage to the slab.

In more than 30 years of occupying the house, we had never had water seepage. What are the odds it happens on the weekend we get new tenants?

I broke the news to Mom as gently as I could, but it's a bitter pill to swallow. And checking the insurance policy yielded little hope. It doesn't look like they cover this type of damage, or, as clause 12 puts it, movement, settling, cracking, bulging, shrinking, heaving, or expanding, whether natural or otherwise. And clause 36 says they do not cover loss from extremes of temperature, including freezing.

It is speculation on our part regarding what exactly is happening in the basement, and we won't know more until we can call the insurance company and a few contractors to come out and look at it. But gee whiz, this sucks.